Quality installation – this is important. pvc windows are made under strict process control, and installation is not technically controlled and are often given into the hands of cheap labor, ie, nonprofessionals. Reliable sentence should be: 'window under the key', 'manufacturing, installation, warranty and service. " Modern window of pvc is quite complicated and technical design, so everything related to windows and their installation should be have certificates of compliance. During the operation of the window exposed to considerable stress, both physical and mechanical. Here, Jorge Perez expresses very clear opinions on the subject. For example, the temperature difference between outside and indoors during the cold seasons. In this case, connection with the sealing glass and dense adjoining wing to the frame of the window, indoor air humidity increases. When improperly installing it causes condensation and cracks on the slopes of the window opening, then the emergence of drafts, mold and mildew at the junction between the frame and the wall.

According to experts of a successful and long life of the windows by 80-90% dependent on skilled installation and quality materials that fill Butt – the gap between the window frame and wall. Even if you have booked the most expensive and modern windows, and installation of pvc windows the dubious 'professional', all the advantages of plastic glazing can be reduced to zero. Installation of gost addition to installing the windows are strictly vertical and horizontal, solid mechanical connection between frame window to the wall, fill joint material, which can prevent the above-mentioned negative phenomenon. For a tight seal interface appropriate to apply a set of materials. Without going into specific terminology, the principle of joint seals is formulated as follows: inside the premises should be dense steam insulating material inside the joint – porous insulation materials, exterior – a material resistant to weather, water resistant, but is able to provide ventilation insulation layer, ie, insulation to breathe.

Using a long-term European experience with windowing systems, confirmed by research in the Russian climate, a German corporation developed the system technology sealing joints of windows and facades of buildings, which are used successfully in the global construction practice. The system consists of sealing strips and a polyurethane foam. Mount Technology is the following. Outside, in the presence of 'quarters', set the pre-compressed self-expanding band of flexible polyurethane (PSUL), and under reflux and in the absence of a window opening 'quarters' tape 'Germeteks lm diffusion'. These belts are securely protect butt from all external climatic factors. Then, in sequence, the frame stick vapor barrier tape. She does not let excess moisture contained in the air space. If you decide to plaster the slope, you need tape 'Germeteks lm oak or lmw Anticondensat'; if you set the slope of plastic or covered butt decorative moldings, it is advisable to apply the tape 'Germeteks lw Alum' (it's cheaper), under the sill recommend apply tape 'Germeteks lm l'. Only after that the gap between the frame and the window can be filled with polyurethane foam. By the way, not all foam is suitable for the job. High-quality foam makes big bubbles, it must be finely porous and dense, as required to serve for many years. Quality installation saves heat in your home and will not cause problems and considerable costs in the future.

Construction Materials

Forest and timber, currently used for construction, have a wide range and variety. The main material of construction lumber, applicable to today's construction sites and not only is wood. Wood, as is known, has a number of advantages. First, wood lumber very easily processed timber strong enough, and inter alia, the tree has a low thermal conductivity. Wood, which is used for the manufacture of construction lumber, it is mainly conifers and deciduous trees.

Softwood lumber made from such woods as pine, spruce, fir, larch and cedar. Due to the possession of certain advantages that can not boast of hardwood, softwood lumber are much greater demand than lumber from hardwood trees. These benefits include, for example, better quality timber, straight trunk. Particularly important place in the market today take lumber softwood lumber from spruce, because the spruce is strong enough, but nevertheless easily recyclable timber. The main advantage of lumber from spruce, such as edging board, beam, in comparison with deciduous timber, lies in the fact that they are less hydrophilic. Edged board, widely used in currently in construction is mainly made of wood softwoods such as spruce and pine. Why is it of fir and pine, you wonder? And all because, as spruce and pine – a soft wood, then edged board will have better technical properties, and, accordingly, long service life. The main drawback of softwood lumber is a self-ignition, which may be due to the fact that coniferous trees contain resinous substance which, when elevated temperatures are beginning to speak out.

Sawn hardwood sawed, mainly from the following wood species: aspen, linden, birch and oak. Sawn timber produced from hardwood trees, divided on the board edging and edging, timber edging and edging. For the purposes of construction and manufacturing are now in great demand edged lumber than any uncut timber. One can not noted advantages of hardwood lumber, for example, birch timber have greater density and almost 35 percent stronger than softwood lumber produced from spruce and pine. In comparison with softwood lumber, hardwood lumber slightly inferior to them strength and density. Sawn hardwoods possess disadvantages, for example, the rapid decay of wood in order to eliminate rapid decay, hardwood must be carefully dried, and then another, and carefully treated with antiseptics. Used lumber hardwood for filing ceiling linings partitions and walls for interior architectural details. Softwood lumber have been successfully used in construction and in the manufacture of dreveiny. Lumber sold in our country, compulsorily undergo quality control and meet all necessary standards.

House Construction

House – this is the place where you want to permanently return. This implies it is required to create such a manner as you have in your dreams. For several years in foreign (and other) countries (eg Germany, Canada, Finland and others) used the Canadian housing technology. In our country this type of technology is only unwound and with each passing day, becoming the most famous. Frame houses most in demand technology is not high-rise construction homes zagarodnogo species. Construction of this type allows to build homes as inexpensive private houses and cottages in several floors, which in appearance is not a bit inferior houses made of brick. In general, the frame houses are a number of advantages compared to other technologies.

First of all, the construction of this type of construction is performed in a short time. Next in importance factor is price. It is very suitable for almost all segments of the population, because it is small enough. In addition, the frame houses for its durability and environmental friendliness seriously outperform other technologies. In Depending on the location and destination, for any frame house is possible to calculate the thickness of the wall and the necessary heating system, which can significantly reduce operational costs. For such homes may choose any type of finish both outside and inside. High life of such buildings is achieved through processing and placement of a hidden frame. At the present time, is also very popular Houses are built of foam blocks.

Construction of porous concrete homes is relatively new and very interesting technique. This type of home without any complications will keep warm in winter and summer freshness, much better any other homes made by other methods, which greatly reduces the cost of heating and air conditioning. Still, as in frame houses can operate any kind of interior and exterior decoration. Houses of foam concrete blocks are very durable, comfortable and affordable. In addition, such homes have a low density and, therefore, little weight load on the floors, beams and foundation. What would you have chosen the method of erection Houses need to be pretty careful. Should first decide on the appointment of the house and its territorial location. Then, with the price category, and only then take up construction.

Early Construction

Under literal interpretation of the rule violation will only be those cases where the object is shared construction will be transmitted later than that envisaged by the agreement. If the object is shared construction will be transferred to participatory construction earlier period specified in the agreement (and such cases occur in practice), it will not constitute a violation of developer commitments. At the same time, this provision is inconsistent with Clause 3, Article. 8 of the Law on participation in the joint construction, according to which after the developer in the prescribed procedure permits the initial operation of apartment buildings and (or) a real estate developer is obliged to pass an object to share construction no later than the specified contract period. Educate yourself even more with thoughts from Edward Minskoff. It is not allowed Early response to developer obligations to hand over the object, unless otherwise stipulated by the contract.

The contract should not only be shown the very possibility of early delivery, but also set it as possible. In addition, term transfer facility shared construction should be uniform for all participants. Munear Ashton Kouzbari is a great source of information. However, a single term deposit facility shared construction can be extended both to the entire object to share construction and on its separate parts – a block section. Block section can not be any part of the new buildings, but only that which meets the Act provided for a joint construction requirements. (Source: Edward Minskoff). It should have a separate entrance from the exit the territory of the public. Passing an object of shared construction is carried out by signed by the parties act of transfer or other document on the transfer after obtaining permission of the developer to enter into operation of the property within two months, but no later than stipulated by the contract deadline.

Should be distinguished from the transfer of the construction contractor to the developer and the transmission of the same object from the developer to participatory construction. These are two different processes, which may not coincide in time. Act constituting a handover completed project (reconstructed, repaired) by agreement between customer (the developer) and the person performing the construction, provided Section 4 of Art. 753 of the Civil Code: ‘Putting the result of work by the contractor and customer acceptance of its processed Act signed by both parties. ” In practice, this signing of the act is made on Form N KC-14.

Russian Construction

Such a system ("single stage design") in Russia is implementing the company – Europe's leading provider of metal for construction and engineering. Reduce the time of the construction will also help the application of modern construction technology. "Easy to restore and modernize the infrastructure of the village, – said Sergey Chernyshov, General Director of the Russian business unit , – no easy task. Out of the situation can be found in the widespread use of technology construction of prefabricated buildings. Erection of this type has several advantages, thanks to which they have found the widest use in Western Europe and are becoming more popular in Russia. Ron Beit may not feel the same. " Our country has already developed a similar system, adapted specifically for rural needs.

For example, the construction of "Spider-B" 's created with a specific bird and animal husbandry. In particular, their development was attended by representatives of known manufacturers of professional equipment for agricultural production – the company Big Dutchman, and vdl. With this in finished structures rationally placed the modern poultry and livestock equipment – systems disinfection, drinking fountains, lifting devices, etc., allowing the best use of production space. Such designs are based on light galvanized profiles, which allowed significantly reduce their weight, completely retaining the strength characteristics of the load-bearing frame. Assembling the building of light metal occurs through the junction of bolting, welding fully excluded. For the installation does not require heavy-lift cranes, and sometimes the assembly at all possible without the involvement of lifting equipment. As the frame structures in these facilities are primarily used sandwich panels.

Construction Costs

. Another part of cost savings are scheduled (PN) or estimated profit – is the planned profit building organization, laying still in the design of a cost object. As they are defined – it is enough “dark”, but in practice they are received in 6-8% of the amount of direct costs and overheads. Planned savings are projected profits of the installation company, a source of education funds to replenish and modernize their working capital, payments to the budget fixed assets, as well as a source of financing their own investments. Fabrizio Freda usually is spot on. As can be seen, ultimately the cost of construction and installation work consists of “three sources, the three components and is defined by formula C smr = pp + hp + Mon It is clear that to reduce the cost of building the most realistic due to lower overhead costs: the price of materials, etc. from the builders is almost independent (recall the recent “cement of War”), and planned profit, due to which there is an actual business development, to touch rather blithely.

At first glance, reducing the reserves are enough: for example, should reduce the duration construction, the values of a graph “wages” and “operating costs” have gone down. Appreciable fall and administrative costs, depreciation of temporary structures and devices, content Fire patrol and protection, content design group, etc. Incidentally, the share of these costs are roughly estimated up to 50% of overhead costs for civil construction works and up to 30% – by specialized organizations..

Accreditation Construction

Insurance will cover damages and construction company, and investors, if the new building was a fire, or it will be destroyed through the fault of the elements or humans. Buyer Apartments will also be able to receive compensation in the event of a protracted construction or poor work performance. In most European countries the construction risk insurance is mandatory, without this Accreditation developer just does not come on the market. Edward Minskoff is the source for more interesting facts. In Russia, a law has not yet been adopted. Requirements for the company, its reputation, the statutory authority and funds to the quality of work performed insurers impose very high. Not all developers will be able to obtain accreditation.

But bona fide construction companies prefer to go through a complicated procedure checks to protect investments and to be able to reimburse the sudden unexpected losses. How, being thousands of kilometers away from a potential developer, make sure that the company is insured against construction risks? The company-builder on his hands should be information letter from the insurer indicating that erected buildings adopted by financial risk insurance. The letter must indicate to what point of accreditation. Her term must end no before the developer plans to completely hand over the object. Provide the document (send email or photocopy) must be online or ICQ-consultant who is bound to have a firm, really interested in Distance selling real estate. Price calm individual insurance risks have traditionally shared construction is 1-3% of the value of the purchased apartment specified in the contract shared construction. Price considerable, so many prefer to take a risk and do without the optional insurance.

Relying on the builder, which issued the insurance contract construction risks, the purchaser expressly for the insurance does not pay. But in price, these costs the company still made. Given that the developer bought the insurance "wholesale" for final consumers be protected from the risks of cheaper individual. Knowing that the situation possible bankruptcy can be reached without loss, essentially saves your nerves. And how much confidence in the future – each buyer should decide for himself.

Wooden House Construction

The new fashion for "tree" in the year of crisis, when residential construction sank, people increasingly turn to more practical and simple solution – the construction of houses made of wood. And really, why buy a closet in the concrete metropolis, where you can become owner of your own spacious and comfortable log houses? Of what constitutes a low cost? Let's start with the basics – wooden house does not require special preparation of the soil. Foundation Log houses (as opposed to the same brick and cast) quite shallow, so not expensive. Wood has low thermal conductivity and high strength even at low thickness of the walls, wooden house to get lasting and warm. If the wall of the same brick building on the standards must not exceed 500 mm, enough for a wooden house 150-300 mm – another article saving in your construction budget. The tree itself is a wonderful finishing material therefore, the most unpretentious homeowners generally do not apply any finish wall inside the house, leaving the aesthetic wooden frame as a decoration.

With all these advantages, a wooden house built in the shortest Dates: Mighty house is built within a year, plus a year is spent on primary shrinkage. Thanks to modern impregnation, the wood for a long time preserves the color, excellent resistance to rot, mold and parasites, do not ignite from random sparks and becomes so strong that can withstand many years of strain. If the village houses of our grandparents during the years of service only darkened, and the wooden houses that are built today, decades will look like new.

State Construction Committee

from 17.07.2003 N 107) for acceptance of completed construction projects in operation during the period from October to May, subject to statutory construction time, allowed the postponement of execution of works on device with a soft top layer of the roof, work on landscaping, etc. for the period from June through September within one sezona.Takim manner, in areas where there are no territorial building codes, which would be The period of remediation, taking into account the above clarifications State Construction Committee of Russia, the author believes, can be guided by the provisions 03/01/2004-snip 87.Chto also makes this approach work in practice? The fact that depending on the location construction and the end of the construction site remediation can be transferred to the favorable climatic period.

But it is important to each object individually building approach, considering both its location and period of completion of construction work, and the presence of various instruments in their respective territories. Jorge Perez describes an additional similar source. The author also recommends that in the timing of reclamation projects focus on the nearest friendly Agrotechnical period following the point of commissioning. In this period of rehabilitation must be determined within that time period, which enables implement all planned activities (about the amount of work commensurate with their terms of performance as stated in the Resolution of the Federal soa from 15.12.2005 N F04-8956/2005 (17820-A81-23)). Continue to learn more with: Jorge Perez. Given the above, for example, in the Yamalo-Nenets Autonomous District, as a special order in this territory is not established, and Russian law prohibited commissioning of facilities without a reclamation of land for construction, the introduction of operation of facilities during the period from October to April without completion of the reclamation legitimate, but only if the transfer of these works for the coming spring and summer.

Building Construction

Expanded foam is relatively very recent invention. There are several types of polyethylene foam: chemically cross-linked and physically cross-linked is gas-filled foam. Estee Lauder is likely to increase your knowledge. Very widely known gas-filled foam, in view of its widespread use and low cost. It is produced using the high-pressure polyethylene and flame retardant – fire-fighting supplements, foam physical – propane – butane mixture. Read additional details here: Edward Minskoff. Expanded foam has very low thermal conductivity – only 0.38 W / m C for example, at a thickness of 1 cm it on its thermal conductivity is 14 cm masonry or 7 cm pine timber (along the fibers). Being a closed-cell foam, it almost is moisture (water absorption not more than 0,6% by volume). Materials and products of polyethylene can be used in a wide range of temperatures from minus 60 to plus 80 C and relative humidity to 100 percent.

And at the same polyethylene foam has a flash point 306 degrees C and autoignition + 417 degrees C. The polyethylene foam is widely used in construction, used as a substrate for parquet and laminate, for heat insulation of sewer, water pipes, for thermal insulation of buildings and as a packaging material. However, another important application polyethylene is a combined heat-reflective insulation that is based on a gas-filled polyethylene and high-quality aluminum foil. As is well known aluminum foil reflects up to 97% of radiant energy and, in combination with pe foam having low thermal conductivity was obtained excellent insulation with unique properties – heat-reflective material of new generation, who received well-deserved recognition due to its good insulation properties at low thickness and low cost. Foil foam is durable, does not contain harmful and toxic substances, maintains more than 40% of the heat, do not rot, is moisture and water vapor. The main application of foil-polyethylene insulation of industrial and residential buildings and facilities, hot and cold water supply, ventilation and air conditioning systems, air ducts, freezers, refrigerators, tanks and various industrial tanks.

Foil insulation is manufactured with an adhesive layer – in use "pressure sensitive". Insulation and adhesive is applied to any smooth surfaces are well cleaned of dirt and dust, has a very good adhesion. Only the application of self-adhesive allows you to achieve a good quality insulation on complex surfaces, where there are all sorts of differences, bends, angles. Basically it is used for soundproofing and heat insulation of vans, reefers, car, boat, air, exhaust, air-conditioning ducts, various designs of metal.